Sep 30, 2020 · The Solution: the solution proposed by Morello was to design and build 2 self-propelled OMNI-directional heavy duty platform carts to manage the movement of the concrete panels at the plant. The trolleys are 12 metres (40 feet) in length and are designed to lift A-frame steel palletsCustom to support and move the pre-cast structures.